{"id":17,"date":"2021-04-01T23:32:28","date_gmt":"2021-04-01T23:32:28","guid":{"rendered":"https:\/\/tok-kontrol.rs\/?page_id=17"},"modified":"2021-07-04T15:21:34","modified_gmt":"2021-07-04T13:21:34","slug":"reference","status":"publish","type":"page","link":"https:\/\/tok-kontrol.rs\/en\/reference\/","title":{"rendered":"References"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Safety assessment reports<\/h2>\n\n\n<div class=\"table-wrap\">\n<table id=\"tablepress-10\" class=\"tablepress tablepress-id-10\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">No.<\/th><th class=\"column-2\">Name of the legal entity to which the report was made<\/th><th class=\"column-3\">Name of the significant change for which the report is issued<\/th><th class=\"column-4\">Report no.<\/th><th class=\"column-5\">Date of issue<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1.<\/td><td class=\"column-2\">Metanolsko sir\u0107etni kompleks a.d., 3 Be\u010dejski put Street, Kikinda, Republic of Serbia<\/td><td class=\"column-3\">Modification of the wagon-tank maintenance plan, series \u2013 subseries 7977 by extending the regular repair period from 5 to 8 years<br \/>\n<\/td><td class=\"column-4\">IZ - 01.0\/04.20<\/td><td class=\"column-5\">10.04.2020.<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2.<\/td><td class=\"column-2\">Metanolsko sir\u0107etni kompleks a.d., 3 Be\u010dejski put Street, Kikinda, Republic of Serbia<\/td><td class=\"column-3\">Modification of the wagon-tank maintenance plan, series \u2013 subseries 7848, 7849 and 7962 by extending the regular repair period from 5 to 8 years<\/td><td class=\"column-4\">IZ - 02.0\/04.20<\/td><td class=\"column-5\">30.04.2020.<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3.<\/td><td class=\"column-2\">Metanolsko sir\u0107etni kompleks a.d., 3 Be\u010dejski put Street, Kikinda, Republic of Serbia<\/td><td class=\"column-3\">Modification of the wagon-tank maintenance plan, series \u2013 subseries 7848, 7849 and 7962 by extending the regular repair period from 5 to 8 years<br \/>\n<\/td><td class=\"column-4\">IZ - 03.0\/11.20<\/td><td class=\"column-5\">24.11.2020.<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4.<\/td><td class=\"column-2\">Joint Stock Company for Freight Railway Transport \u201cSrbija Kargo\u201d, Belgrade, 6 Nemanjina Street, Republic of Serbia<br \/>\n<\/td><td class=\"column-3\">Installation of elastomer on draw-buffer gear<\/td><td class=\"column-4\">IZ - 01.0\/03.21<\/td><td class=\"column-5\">09.03.2021.<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Safety assessment report for the  correct application of the change risk management process of the following: <br \/>\n- infrastructure structural subsystem,<br \/>\n- energy structural subsystem,<br \/>\n- control, command and signaling structural subsystem \u2013 trackside,<br \/>\n- operation and traffic management functional subsystem,<br \/>\non the section Belgrade Center - Novi Sad (entry point) of the railway (Belgrade Center) - Stara Pazova - Novi Sad - Subotica - State Border (Kelebia), for speeds up to 200 kmph - within the Safety Management System<br \/>\n<\/td><td class=\"column-4\">IZ.OB-01.0\/03.22<\/td><td class=\"column-5\">10.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Safety assessment report for the correct application of the change risk management process in the infrastructure structural subsystem on the section Belgrade Center - Novi Sad (entry point) of the railway (Belgrade Center) - Stara Pazova - Novi Sad - Subotica - State Border (Kelebia) for speeds up to 200 kmph<\/td><td class=\"column-4\">IZ.OB-02.0\/03.22<\/td><td class=\"column-5\">10.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Safety assessment report for the correct application of the change risk management process in the energy structural subsystem on the section Belgrade Center - Novi Sad (entry point) of the railway (Belgrade Center) - Stara Pazova - Novi Sad - Subotica - State Border (Kelebia) for speeds up to 200 kmph<\/td><td class=\"column-4\">IZ.OB-03.0\/03.22<\/td><td class=\"column-5\">10.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Safety assessment report for the correct application of the change risk management process in the control, command and signaling structural subsystem \u2013 trackside, on the section Belgrade Center - Novi Sad (entry point) of the railway (Belgrade Center) - Stara Pazova - Novi Sad - Subotica - State Border (Kelebia), for speeds up to 200 kmph<\/td><td class=\"column-4\">IZ.OB-04.0\/03.22<\/td><td class=\"column-5\">10.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9.<\/td><td class=\"column-2\">Joint Stock Company for Passenger Railway Transport \u201cSrbija Voz\u201d, 11000 Belgrade, 6 Nemanjina Street, Republic of Serbia<\/td><td class=\"column-3\">Safety assessment report for the application of the change risk management process related to the change in operating conditions on the section Belgrade Center - Novi Sad (entry point) of the railway (Belgrade Center) - Stara Pazova - Novi Sad \u2013 Subotica - State Border (Kelebia), for speeds up to 200 kmph - within the Safety Management System<\/td><td class=\"column-4\">IZ.OB-05.0\/03.22<\/td><td class=\"column-5\">10.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10.<\/td><td class=\"column-2\">Public company \u201cElektroprivreda Srbije\u201d from Belgrade, 13 Balkanska Street, Nikola Tesla TPPs branch Belgrade-Obrenovac, 11500 Obrenovac, 44 Bogoljuba Uro\u0161evi\u0107a Crnog Street<\/td><td class=\"column-3\">Safety assessment report on the correct application of the risk management process related to the extension regular repair period for the electric locomotive 443-03 on the Nikola Tesla TPPs branch industrial railway<\/td><td class=\"column-4\">IZ.OB-06.0\/03.22<\/td><td class=\"column-5\">29.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11.<\/td><td class=\"column-2\">Public company \u201cElektroprivreda Srbije\u201d from Belgrade, 13 Balkanska Street, Nikola Tesla TPPs branch Belgrade-Obrenovac, 11500 Obrenovac, 44 Bogoljuba Uro\u0161evi\u0107a Crnog Street<\/td><td class=\"column-3\">Safety assessment report on the correct application of the risk management process related to the extension regular repair period for the electric locomotive 443-08 on the Nikola Tesla TPPs branch industrial railway<\/td><td class=\"column-4\">IZ.OB-07.0\/03.22<\/td><td class=\"column-5\">29.03.2022.<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Report on safety assessment for proper application of the risk control management procedure for reconstruction and modernization of the Infrastructure subsystem on the railway line no.201 Subotica \u2013 Horgos - state border - (R\u00f6szke)<\/td><td class=\"column-4\">IZ.OB-08.0\/07.22<\/td><td class=\"column-5\">29.07.2022.<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Report on safety assessment for proper application of the risk control management procedure for reconstruction and modernization of the Energy subsystem on the railway line no.201 Subotica \u2013 Horgos - state border - (R\u00f6szke)<\/td><td class=\"column-4\">IZ.OB-09.0\/07.22<\/td><td class=\"column-5\">29.07.2022.<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Report on safety assessment for proper application of the risk control management procedure for reconstruction and modernization of the Control Command and Signalling subsystem on the railway line no.201 Subotica \u2013 Horgos - state border - (R\u00f6szke)<\/td><td class=\"column-4\">IZ.OB-10.0\/07.22<\/td><td class=\"column-5\">29.07.2022.<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Report on safety assessment for proper application of the risk control management procedure for change of the functional subsystem Operation and Traffic Management on the railway line no.201 Subotica \u2013 Horgos - state border - (R\u00f6szke)<\/td><td class=\"column-4\">IZ.OB-11.0\/07.22<\/td><td class=\"column-5\">29.07.2022.<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">16.<\/td><td class=\"column-2\">Joint Stock Company for Passenger Railway Transport \u201cSrbija Voz\u201d, 11000 Belgrade, 6 Nemanjina Street, Republic of Serbia<\/td><td class=\"column-3\">Report on the safety assessment of changes in the maintenance deadlines of railway vehicles (traction vehicles and passenger cars) included in the rolling stock of Joint Stock Company for Passenger Railway Transport \u201cSrbija Voz\u201d<\/td><td class=\"column-4\">\u0418\u0417.\u041e\u0411-01.0\/09.23<\/td><td class=\"column-5\">08.09.2023.<\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">17.<\/td><td class=\"column-2\">Joint Stock Company for Passenger Railway Transport \u201cSrbija Voz\u201d, 11000 Belgrade, 6 Nemanjina Street, Republic of Serbia<\/td><td class=\"column-3\">Report on safety assessment for risk management of passenger transportation in EMV series 412\/416 for which the term of regular repair was extended<\/td><td class=\"column-4\">\u0418\u0417.\u041e\u0411-02.0\/09.23<\/td><td class=\"column-5\">08.09.2023.<\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">18.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Independent safety assessment report of the risk management procedure of the Proposer the \u201cInfrastructure of Serbian Railways\u201d JSC for a change of functional subsystem for traffic regulation and management, which is created by the reconstruction and modernization of the existing track of the single-track railway line and the construction of the second track of the railway line for mixed passenger and freight traffic for speed up to 200 km\/h, on the section Novi Sad - Subotica - state border (Kelebija), of the railway line (Belgrade Centre) - Novi Sad - Subotica - state border (Kelebija), in accordance with Annex 1 to the Common Safety Method Regulation for Risk Assessment and Evaluation and the Conditions to be met by the Risk Assessment Body<\/td><td class=\"column-4\">\u041a\u0422-\u0410\u0441\u0411\u043e-\u0418\u041e\u0411-\u041f004-4\/24<\/td><td class=\"column-5\">19.11.2024.<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">19.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Independent safety assessment report of the risk management procedure of the Proposer the \u201cInfrastructure of Serbian Railways\u201d JSC for a change of structural subsystem energy, which is created by the reconstruction and modernization of the existing track of the single-track railway line and the construction of the second track of the railway line for mixed passenger and freight traffic for speed up to 200 km\/h, on the section Novi Sad - Subotica - state border (Kelebija), of the railway line (Belgrade Centre) - Novi Sad - Subotica - state border (Kelebija), in accordance with Annex 1 to the Common Safety Method Regulation for Risk Assessment and Evaluation and the Conditions to be met by the Risk Assessment Body<\/td><td class=\"column-4\">\u041a\u0422-\u0410\u0441\u0411\u043e-\u0418\u041e\u0411-\u041f002-2\/24<\/td><td class=\"column-5\">03.12.2024.<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">20.<\/td><td class=\"column-2\">ZGOP DOO Novi Sad, Industrijska bb, 21000 Novi Sad<\/td><td class=\"column-3\">Report on the independent safety assessment of the risk management process of the proposer ZGOP DOO Novi Sad for the change of the maintenance functional subsystem, resulting from the modification of the railway vehicle maintenance plan, in accordance with Annex 1 of the Regulation on the Common Safety Method for risk assessment and evaluation and the conditions to be met by the risk assessment body<\/td><td class=\"column-4\">\u041a\u0422-\u0410\u0441\u0411\u043e-\u0418\u041e\u0411-\u041f005-10\/24<\/td><td class=\"column-5\">06.12.2024.<\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">21.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Report on the independent safety assessment of the risk management procedure of the proposer \"Infrastruktura \u017eeleznice Srbije\" a.d. for the change of the functional subsystem of traffic regulation and management, for freight train traffic, on the section (Novi Sad Marshaling Yard) - Rasputnica Sajlovo - Subotica - (state border), main railway line no. 105 (Belgrade Centre) - Stara Pazova - Novi Sad - Subotica - state border - (Kelebija) based on the Temporary Instruction on the organization and regulation of freight train traffic on the section of the Novi Sad Shunting - Subotica railway, in accordance with Annex 1 of the Regulation on the Common Safety Method for risk assessment and evaluation and the conditions to be met by the risk assessment body<\/td><td class=\"column-4\">\u041a\u0422-\u0410\u0441\u0411\u043e-\u0418\u041e\u0411-\u041f001-5\/25<\/td><td class=\"column-5\">14.08.2025.<\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">22.<\/td><td class=\"column-2\">Joint Stock Company for Public Railway Infrastructure Management \"Infrastructure of Serbian Railways\", 11000 Belgrade, Nemanjina 6, Republic of Serbia<\/td><td class=\"column-3\">Report on the independent safety assessment of the risk management procedure of the proposer \"Infrastruktura \u017eeleznice Srbije\" a.d. for the change of the functional subsystem of traffic regulation and management, for passenger and freight train traffic, on the section (Petrovaradin) - Novi Sad\/Novi Sad Marshaling Yard - Junction Sajlovo - Rumenka - Subotica - (state border), main railway line no. 105 (Belgrade Center) - Stara Pazova - Novi Sad - Subotica - state border - (Kelebija), in accordance with Annex 1 of the Regulation on the Common Safety Method for risk assessment and evaluation and the conditions to be met by the risk assessment body<\/td><td class=\"column-4\">\u041a\u0422-\u0410\u0441\u0411\u043e-\u0418\u041e\u0411-\u041f002-7\/25<\/td><td class=\"column-5\">18.09.2025.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Certificates of conformity of structural subsystem elements according to national regulations<\/strong><\/h2>\n\n\n<div class=\"table-wrap\">\n<table id=\"tablepress-14\" class=\"tablepress tablepress-id-14\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">No.<\/th><th class=\"column-2\">Name of the legal entity to which the report was made<\/th><th class=\"column-3\">Document name<\/th><th class=\"column-4\">Certificate no.<\/th><th class=\"column-5\">Date of issue<\/th><th class=\"column-6\">Validity period<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1.<\/td><td class=\"column-2\">INSTITUT \u201cMIHAJLO PUPIN\u201d DOO, 15 Volgina Street 11060 Belgrade<\/td><td class=\"column-3\">Type examination certificate for the control-command part of the level crossing device: XSAFE 2.0 manufactured by Efacec Engenharia e Sistems S.A. from Portugal, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-01.0\/06.21<\/td><td class=\"column-5\">04.06.2021.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2.<\/td><td class=\"column-2\">\u201cSIGNALING\u201d d.o.o, 496\/E Vojvode Stepe Street, 11000 Belgrade<br \/>\n<br \/>\n<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate \u2013 train detection device TDR14 produced by \u201c\u0410LTPRO\u201d d.\u043e.\u043e., from the republic of Croatia, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-04.0\/09.21<\/td><td class=\"column-5\">16.09.2021.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3.<\/td><td class=\"column-2\">\u201cSIGNALING\u201d d.o.o, 496\/E Vojvode Stepe Street, 11000 Belgrade<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate \u2013 hot box detector type FUES-EPOS manufactured by Progress Rail Inspection &amp; Information Systems GmbH, <br \/>\naccording to \u201cCB\u201d Module<br \/>\n<\/td><td class=\"column-4\">SF.IT-06.0\/09.21<\/td><td class=\"column-5\">28.09.2021.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4.<\/td><td class=\"column-2\">IMP-TELEKOMUNIKACIJE DOO<br \/>\n15 Volgina Street<br \/>\n11060 Belgrade<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate - Digital radio-dispatching system - D-RDC manufactured by IMP-TELEKOMUNIKACIJE DOO Belgrade, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-07.0\/10.21<\/td><td class=\"column-5\">26.10.2021.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5.<\/td><td class=\"column-2\">Branch BALKANTEL LTD Ni\u0161<br \/>\n8 Takovska Street<br \/>\n18000 Nis<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate \u2013 Axle counter track section control system ESSO-M (ERKF.665251.003) manufactured by Scientific and Production Center \"PROMELEKTRONIKA\", Yekaterinburg, Russia, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-02.0\/11.21<\/td><td class=\"column-5\">01.11.2021.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6.<\/td><td class=\"column-2\">Branch BALKANTEL LTD Ni\u0161<br \/>\n8 Takovska Street<br \/>\n18000 Nis<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate \u2013 Universal wheel detector DKU (ERKF. 665252.002-03) manufactured by Scientific and Production Center \"PROMELEKTRONIKA\", Yekaterinburg, Russia, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-03.0\/11.21<\/td><td class=\"column-5\">01.11.2021.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate \u2013wagon- tank Zaes series (7993) serial number 26693, manufactured by METALSKI KOMBINAT \u201cN.H. \u017dIVAN MARI\u010cI\u0106, OOUR-VAGONOGRADNJA\u201d (FVK-Kraljevo), volume 65 m3, <br \/>\naccording to \u201cSB\u201d Module<br \/>\n<\/td><td class=\"column-4\">SF.IT-05.0\/12.21<\/td><td class=\"column-5\">01.12.2021.<br \/>\n<br \/>\n<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<br \/>\n<\/td><td class=\"column-3\">Product type examination certificate \u2013wagon- tank Zas series (7966) serial number 26679, manufactured by METALSKI KOMBINAT \u201cN.H. \u017dIVAN MARI\u010cI\u0106, OOUR-VAGONOGRADNJA\u201d (FVK-Kraljevo), volume 65 m3, <br \/>\naccording to \u201cSB\u201d Module<br \/>\n<\/td><td class=\"column-4\">SF.IT-05.1\/12.21<\/td><td class=\"column-5\">01.12.2021.<br \/>\n<br \/>\n<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26674, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.0\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26675, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.1\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26676, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.2\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26677, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.3\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26678, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.4\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26679, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.5\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26680, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.6\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\">16.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26681, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.7\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\">17.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26682, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.8\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\">18.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26683, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.9\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\">19.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26684, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.10\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\">20.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26685, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.11\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\">21.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26686, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.12\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\">22.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26687, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.13\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\">23.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26688, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.14\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\">24.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zas (7966) serial number 26689, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-01.15\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\">25.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zaes (7993) serial number 26690, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-02.0\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\">26.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zaes (7993) serial number 26691, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-02.1\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\">27.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zaes (7993) serial number 26692, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-02.2\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\">28.<\/td><td class=\"column-2\">ELLIS ENTERPRISES EAST DOO<br \/>\n15 Mike Stojanovi\u0107a Street<br \/>\n37000 Kru\u0161evac<\/td><td class=\"column-3\">Certificate of verification of the structural subsystem - rolling stock - tank wagon series Zaes (7993) serial number 26693, according to \u201cSF\u201d Module<\/td><td class=\"column-4\">SF.VR-02.3\/01.22<\/td><td class=\"column-5\">28.01.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\">29.<\/td><td class=\"column-2\">Telespark d.o.o. Vladimira<br \/>\nPopovi\u0107a 32\/28, 11070 Novi<br \/>\nBeograd<\/td><td class=\"column-3\">Product type examination certificate - Dispatching railway system SI3000 and VRS call recording device produced by ISKRATEL<br \/>\ntelekomunikacijski sistemi<br \/>\nd.o.o. Kranj, Republic<br \/>\nof Slovenia, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-03.0\/03.22<\/td><td class=\"column-5\">17.03.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\">30.<\/td><td class=\"column-2\">Predstavni\u0161tvo Frauscher<br \/>\nSensortechnic GmbH Beograd-<br \/>\nStari Grad, Kneza Mihajla 22,<br \/>\nBeograd<\/td><td class=\"column-3\">Product type examination certificate \u2013 Axle counter system FadC R2 produced by Frauscher Sensortechnic GmbH,<br \/>\nAustria, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-04.0\/06.22<\/td><td class=\"column-5\">09.06.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\">31.<\/td><td class=\"column-2\">Predstavni\u0161tvo Frauscher<br \/>\nSensortechnic GmbH Beograd-<br \/>\nStari Grad, Kneza Mihajla 22,<br \/>\nBeograd<\/td><td class=\"column-3\">Product type examination certificate \u2013 Wheel sensor RSR123 produced by Frauscher Sensortechnic GmbH, Austria, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-05.0\/06.22<\/td><td class=\"column-5\">09.06.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\">32.<\/td><td class=\"column-2\">Predstavni\u0161tvo Frauscher<br \/>\nSensortechnic GmbH Beograd-<br \/>\nStari Grad, Kneza Mihajla 22,<br \/>\nBeograd<\/td><td class=\"column-3\">Product type examination certificate \u2013 Wheel sensor RSR180 produced by Frauscher<br \/>\nSensortechnic GmbH, Austria, according to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-06.0\/06.22<\/td><td class=\"column-5\">09.06.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\">33.<\/td><td class=\"column-2\">CRSC<br \/>\nINTERNATIONAL<br \/>\nCO.,LTD.<br \/>\nBranch<br \/>\nBelgrade<br \/>\nMajevicka 2\u041c, Zemun<br \/>\n11080 Belgrade<\/td><td class=\"column-3\">Product type examination\ncertificate \u2013 Power supply\nsystem PKX1 for supply\nof railway signalling-\ninterlocking devices produced by China Railway Signal &amp; Comunication (CRSC) Co. Ltd, China,\naccording to \u201cCB\u201d\nmodule<\/td><td class=\"column-4\">SF.I\u0422-07.0\/12.22<\/td><td class=\"column-5\">02.12.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\">34.<\/td><td class=\"column-2\">FOTON GMB DOO BEOGRAD, Vinogradska 24, Sur\u010din<\/td><td class=\"column-3\">Product type examination<br \/>\ncertificate - Automatic level<br \/>\ncrossing interlocking device<br \/>\nSPN-900 (command-control<br \/>\npart),produced by the ICF<br \/>\nIngenieria y Control Ferroviario<br \/>\nS.A. Madrid (Spain), according<br \/>\nto \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-08.0\/12.22<\/td><td class=\"column-5\">30.12.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\">35.<\/td><td class=\"column-2\">FOTON GMB DOO BEOGRAD, Vinogradska 24, Sur\u010din<\/td><td class=\"column-3\">Product type examination<br \/>\ncertificate \u2013Axle counter system<br \/>\n\u0410\u0421-900,produced by the ICF<br \/>\nIngenieria y Control<br \/>\nFerroviarioS.A. Madrid (Spain),<br \/>\naccording to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-09.0\/12.22<\/td><td class=\"column-5\">30.12.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\">36.<\/td><td class=\"column-2\">FOTON GMB DOO BEOGRAD, Vinogradska 24, Sur\u010din<\/td><td class=\"column-3\">Product type examination<br \/>\ncertificate \u2013Wheel sensor<br \/>\n(detector), SDE-900 produced<br \/>\nIngenieria y Control<br \/>\nFerroviarioS.A. Madrid (Spain),<br \/>\naccording to \u201cCB\u201d Module<\/td><td class=\"column-4\">SF.IT-10.0\/12.22<\/td><td class=\"column-5\">30.12.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\">37.<\/td><td class=\"column-2\">CRSC INTERNATIONAL<br \/>\nCO.,LTD. OGRANAK<br \/>\nBelgrade<br \/>\nMajevicka 2\u041c, Zemun<br \/>\n11080 Belgrade<\/td><td class=\"column-3\">Product Type Examination<br \/>\nCertificate - Electric Switch<br \/>\nSetting Device ZDJ9-XS by<br \/>\nChina Railway Signal &amp;<br \/>\nComunication (CRSC) Co.<br \/>\nLtd, China, according to<br \/>\nto \u201cCB\u201d Module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-01.0\/01.23<\/td><td class=\"column-5\">30.01.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\">38.<\/td><td class=\"column-2\">SIGNALING DOO <br \/>\nTosin Bunar 187<br \/>\n11070 New Belgrade<\/td><td class=\"column-3\">Certificate of product type examination\u2013Axle counter system BO23, manufacturer ALTPRO d.o.o, Republic Croatia , according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-02.0\/04.23<\/td><td class=\"column-5\">21.04.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\">39.<\/td><td class=\"column-2\">OGRANAK BALKANTEL LTD NI\u0160<br \/>\n8 Takovska Street<br \/>\n18000 Nis<\/td><td class=\"column-3\">Certificate of product type examination\u2013Station electronic interlocking device MPC-I release 2, labelERKF.424359.002-01, manufacturer \u201eBALKANTEL\u201c ltd R.Bulgaria, according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-03.0\/05.23<\/td><td class=\"column-5\">12.05.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\">40.<\/td><td class=\"column-2\">SIGNALING DOO <br \/>\nTosin Bunar 187<br \/>\n11070 New Belgrade<\/td><td class=\"column-3\">Certificate of product type examination\u2013Track magnet type PM500, produced by  ALTPRO d.o.o, Republic of Croatia , according to \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-04.0\/05.23<\/td><td class=\"column-5\">20.05.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\">41.<\/td><td class=\"column-2\">SIGNALING DOO <br \/>\nTosin Bunar 187<br \/>\n11070 New Belgrade<\/td><td class=\"column-3\">Certificate of product type examination \u2013Track magnet type PM1020, produced by  ALTPRO d.o.o, Republic of Croatia , according to \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-05.0\/05.23<\/td><td class=\"column-5\">20.05.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\">42.<\/td><td class=\"column-2\">CRSC INTERNATIONAL CO.,LTD.BRANCH BEOGRAD<br \/>\nMajevicka 2\u041c, Zemun<br \/>\n11080 Belgrade<\/td><td class=\"column-3\">Certificate of product type examination \u2013Track magnet type Indusi-Balise-TH.PM1020, produced by \u201eCRSC Research &amp; Design Institute Group Co., Ltd.\u201c, China,according to \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-06.0\/06.23<\/td><td class=\"column-5\">02.06.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\">43.<\/td><td class=\"column-2\">CRSC INTERNATIONAL CO.,LTD.BRANCH BEOGRAD<br \/>\nMajevicka 2\u041c, Zemun<br \/>\n11080 Belgrade<\/td><td class=\"column-3\">Certificate of product type examination \u2013Track magnet type Indusi-Balise-TH.PM500, produced by \u201eCRSC Research &amp; Design Institute Group Co., Ltd.\u201c, China,according to \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-07.0\/06.23<\/td><td class=\"column-5\">02.06.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\">44.<\/td><td class=\"column-2\">IMP-BEEL DOO BEOGRAD<br \/>\nVolgina 15, 11060 Belgrade<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201eRailway LED lantern LL-000-m\u201c, produced by INSTITUTE MIHAJLO PUPIN-BEEL DOO BEOGRAD (ZVEZDARA),according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-08.0\/06.23<\/td><td class=\"column-5\">19.06.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\">45.<\/td><td class=\"column-2\">IMP-BEEL DOO BEOGRAD<br \/>\nVolgina 15, 11060 Belgrade<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201eRadio base station ZR47S\u201c, produced byT-CZ a.s.Czech Republic,according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-09.0\/07.23<\/td><td class=\"column-5\">05.07.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\">46.<\/td><td class=\"column-2\">CRSC INTERNATIONAL CO.,LTD.BRANCH BEOGRAD<br \/>\nMajevicka 2\u041c, Zemun<br \/>\n11080 Belgrade<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201eDispatching telecommunication system (CZ.DRTD \u2013 DCC, CZ.DRTD \u2013 DC,  CZ. DRTD \u2013 APB, CZ.DRTD \u2013 TIS,   CZ.DRTD \u2013 TUS)\u201c, produced by \u201eCRSC Research &amp; Design Institute Group Co., Ltd.\u201c, Chinaaccording to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-10.0\/07.23<\/td><td class=\"column-5\">10.07.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\">47.<\/td><td class=\"column-2\">FOTON GMB DOO BEOGRAD, Vinogradska 24, Sur\u010din<\/td><td class=\"column-3\">Product type examination certificate - \u201eLED lamp LD-136-PEC LED\u201c, produced by ELECTROSISTEMAS BACH S.A. (Electrans), according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-11.0\/06.22<\/td><td class=\"column-5\">30.06.2022.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-49\">\n\t<td class=\"column-1\">48.<\/td><td class=\"column-2\">SIGNALING DOO <br \/>\nTosin Bunar 187<br \/>\n11070 New Belgrade<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201eLevel crossing interlocking device RLC23\u201c, produced by ALTPRO d.o.o, Republic of Croatia, according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-12.0\/07.23<\/td><td class=\"column-5\">14.07.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-50\">\n\t<td class=\"column-1\">49.<\/td><td class=\"column-2\">Institute Mihajlo Pupin doo Beograd\nVolgina 15, 11060 Belgrade<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201eUniversal railway telephone UPT (TIS, TUS, TAPB, TPP, TCB )\u201c, produced byInstitute Mihajlo Pupin doo Beograd, as an integral part of the dispatching telecommunication, according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-13.0\/07.23<\/td><td class=\"column-5\">10.07.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-51\">\n\t<td class=\"column-1\">50.<\/td><td class=\"column-2\">Institute Mihajlo Pupin doo Beograd\nVolgina 15, 11060 Belgrade<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201eCTC device CTC \u2013 ST\u201c, produced by Institute Mihajlo Pupin doo Beograd<br \/>\n, according to the \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-14.0\/07.23<\/td><td class=\"column-5\">20.07.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-52\">\n\t<td class=\"column-1\">51.<\/td><td class=\"column-2\">IMP-Telekomunikacije doo Belgrade, Volgina 15, 11060 Belgrade<\/td><td class=\"column-3\">Product type test certificate \u2013 \u201cRailway dispatch switchboard device SPDC\", manufactured by IMP-Telekomunikacije doo Belgrade, according to Module \"CB<\/td><td class=\"column-4\">\u0421\u0424.\u0418\u0422-15.0\/07.23<\/td><td class=\"column-5\">24.07.2023.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-53\">\n\t<td class=\"column-1\">52.<\/td><td class=\"column-2\">GALEB Signalizacija d.o.o. Sabac, Pocerska 111 Sabac<\/td><td class=\"column-3\">Product type examination certificate - \"Small track balise 500 Hz GFSU PB5\", manufacturerGALEB Signalizacija d.o.o. Sabac, according to Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f001-5\/24<\/td><td class=\"column-5\">17.04.2024.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-54\">\n\t<td class=\"column-1\">53.<\/td><td class=\"column-2\">Ogranak \u0411\u0430\u043b\u043a\u0430\u043d\u0442\u0435\u043b LTD Ni\u0161, \u0422\u0430\u043a\u043e\u0432\u0441\u043a\u0430 8, 18000 \u041d\u0438\u0448<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201e Radio dispatching system RADIS-RAIL \u201c, manufacturerBalkantel Ltd. Sofia, according to Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f002-6\/24<\/td><td class=\"column-5\">09.05.2024.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-55\">\n\t<td class=\"column-1\">54.<\/td><td class=\"column-2\">\u201cSSAMAKS doo\u201d, Milivoja Pavlovica 7, Beograd<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201e Hotbox detection device ZENTRAC MDS\u201c,manufacturerVoestalpine Signaling Siershahn GmbH, Germany,according to Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f003-7\/24<\/td><td class=\"column-5\">07.06.2024.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-56\">\n\t<td class=\"column-1\">55.<\/td><td class=\"column-2\">CRSC INTERNATIONAL CO. LTD<br \/>\nOmladinskih brigada 21, 11070 New Belgrade, Serbia <\/td><td class=\"column-3\">Product type examination certificate\u201cControl-command part of the level crossing device type DLC100\u2013TH\u201c, supplierCRSC Research &amp; Design Institute Group Co., LTD. (CRSCD), China, according to \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f004-8\/24<\/td><td class=\"column-5\">09.10.2024.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-57\">\n\t<td class=\"column-1\">56.<\/td><td class=\"column-2\">Insistute \u201eMihajlo Pupin\u201c d.o.o, Volgina 15, 11060 Belgrade, Serbia<\/td><td class=\"column-3\">Product type examination certificate\u201cControl-command part of the level crossing device type ISIS-LC PV-103\u201c, supplier\u201eEBE Solutions GmbH (Austria)\u201c, according to \u201cCB\u201d module<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f005-9\/24<\/td><td class=\"column-5\">10.10.2024.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-58\">\n\t<td class=\"column-1\">57.<\/td><td class=\"column-2\">Galeb Signalizacija d.o.o. \u0160abac, Pocerska str. 111<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201cHalf-barrier machine device type: PPB 660A\u201d, manufactured by Galeb Signalizacija d.o.o. \u0160abac, according to the Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f001-1\/25<\/td><td class=\"column-5\">14.03.2025.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-59\">\n\t<td class=\"column-1\">58.<\/td><td class=\"column-2\">NIIAS AD Ogranak Beograd Stari grad, Balkanska 2, 6th floor, app. 2603, 11000 Beograd<\/td><td class=\"column-3\">Product type examination certificate  \u2013 CTC device \u201eDispatcher centralization and dispatcher control system\u201d, manufactured by TRANS-TELEMATIKA DOO, according to the Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f002-2\/25<\/td><td class=\"column-5\">04.06.2025.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-60\">\n\t<td class=\"column-1\">59.<\/td><td class=\"column-2\">Galeb Signalizacija d.o.o. \u0160abac, Pocerska str. 111<\/td><td class=\"column-3\">Product type examination certificate \u2013 \u201cSmall combined track magnet 1000\/2000 Hz type: GFSU PB21\u201c,manufactured by Galeb Signalizacija d.o.o. \u0160abac,according to the Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f003-3\/25<\/td><td class=\"column-5\">17.07.2025.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<tr class=\"row-61\">\n\t<td class=\"column-1\">60.<\/td><td class=\"column-2\">NIIAS AD Ogranak Beograd Stari grad, Balkanska 2, 6th floor, app. 2603, 11000 Beograd<\/td><td class=\"column-3\">Product type examination certificate  \u2013 Hot box detection device \u2013 \u201eAutomated thermal control system for vehicle drive mechanisms\u201d, type \u0422R\u041c\u0415.421412.001\u201c, manufactured by TRANS-TELEMATIKA DOO, according to the Module \u201cCB\u201d<\/td><td class=\"column-4\">\u0421\u0422-\u0414\u0435\u0411\u043e-\u0421\u0424.\u0418\u0422-\u041f005-6\/25<\/td><td class=\"column-5\">24.09.2025.<\/td><td class=\"column-6\">5 (five) years<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0418\u0437\u0432\u0435\u0448\u0442\u0430\u0458\u0438 \u043e \u043e\u0446\u0435\u043d\u0438 \u0431\u0435\u0437\u0431\u0435\u0434\u043d\u043e\u0441\u0442\u0438 \u0421\u0435\u0440\u0442\u0438\u0444\u0438\u043a\u0430\u0442\u0438 \u043e \u0443\u0441\u0430\u0433\u043b\u0430\u0448\u0435\u043d\u043e\u0441\u0442\u0438 \u0435\u043b\u0435\u043c\u0435\u043d\u0430\u0442\u0430 \u0441\u0442\u0440\u0443\u043a\u0442\u0443\u0440\u043d\u0438\u0445 \u043f\u043e\u0434\u0441\u0438\u0441\u0442\u0435\u043c\u0430 \u043f\u0440\u0435\u043c\u0430 \u043d\u0430\u0446\u0438\u043e\u043d\u0430\u043b\u043d\u0438\u043c \u043f\u0440\u043e\u043f\u0438\u0441\u0438\u043c\u0430<\/p>","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-17","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/pages\/17","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/comments?post=17"}],"version-history":[{"count":7,"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/pages\/17\/revisions"}],"predecessor-version":[{"id":473,"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/pages\/17\/revisions\/473"}],"wp:attachment":[{"href":"https:\/\/tok-kontrol.rs\/en\/wp-json\/wp\/v2\/media?parent=17"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}